Description: LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off LONG DOG LEAD- Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs Brand Name: STEVVEX Pets Model Number: ST12DB786GBI Type: LeashesDog Leash Type: Basic LeashesMaterial: NylonType: DogsSeason: All seasonsPattern: SolidFeature: PersonalizedFeature: outdoor training dog leash ropeUse for: puppy, small medium and large dog beltUse for 1: training, running dog lead
Checkout happens on the official store. This page mirrors catalog facts in plain HTML for direct reading and crawlability.